University of Campus Football Business

CAT A Office Re-fit

blog-header.jpg
Queensgate Shopping Centre

Heating and Ventilation Systems

blog-header.jpg
Parkway Shopping Centre

Retail EV Charging Station

blog-header.jpg
Chiswick Park

Office EV Chargepoint Installation

blog-header.jpg
Chestnut Grove School

Complete Electrical Installation

blog-header.jpg
Arsenal Training Ground

Pitch Control Panel for Undersoil Heating

EML walking.jpg
EML walking.jpg

CAT A Office Re-fit

Customer:

Service:

Complete Electrical Installation

Kershaw Mechanical

Contract Value:

£100,000

IBMS.jpeg
blog-header.jpg
blog-header.jpg

Our client engaged us to deliver a full electrical installation across three floors of a commercial property. The scope of works included the installation of Electrak powertrack systems beneath the raised access flooring on the top two floors, integration of floor boxes, and modifications to the existing lighting layout and control programming. On the ground floor, the project involved a comprehensive refurbishment of the reception area and function rooms, as well as the installation of a new communications room.


From the outset, we played a consultative role in supporting the client through the design phase and continued to work collaboratively with them through to project delivery and final handover.

Tick_circle.gif

Challenges:

During our initial site validation survey, several discrepancies were identified between the actual site conditions and the ‘as installed’ documentation from the original Cat B fit-out. These findings required adjustments to the installation strategy to ensure compliance and feasibility.


Budget constraints were a key consideration throughout the project. We worked closely with the client to refine the design and scope to ensure all critical requirements were met within the set financial parameters. Additionally, each of the three floors required phased handovers to enable partial occupation of the building during the programme. This added complexity to the scheduling and required precision in execution.

Tick_circle.gif

Approach:

Following the validation survey, we submitted a comprehensive report outlining the issues and proposed solutions, ensuring alignment with the client's budget and project scope. Given the accelerated timeline, initial installation works commenced in parallel with the finalisation of design documentation.


We operated to strict deadlines for each phase, coordinating closely with the main contractor and other trades to ensure seamless delivery. Our flexible and responsive approach allowed for the successful handover of each floor on time, supporting the client’s phased occupancy strategy while maintaining high standards of workmanship and compliance.

Tick_circle.gif

Objectives:

Tick_circle.gif